Early stage of construction of green plastic track stadium:

By the project department of project manager to decorate each member of the project team members responsibilities and work (including: project technical director, quality inspector, security officer, the builder, the operator), the project manager on project progress to command, and inspected by superior departments and the leadership and supervision. The specific duties of each member are as follows:

1. Project technical director: comprehensively responsible for the construction technology of this project.

2. Quality inspector: during the construction process, the quality inspection and acceptance of each sub-item shall be carried out, and the inspection and acceptance of the previous procedure shall not be qualified, and the construction of the next procedure shall not be allowed.

3. Safety officer: responsible for the safety technical disclosure of all construction procedures.

4: construction worker: urge the workers to work strictly according to the technical operation procedure.

5. Materials: prevent unqualified products and semi-finished products from entering the site.

6. Tester: in charge of concrete and mortar test block forming, maintenance and inspection.


Preparation for construction of plastic runway sports ground:

1. Learn the construction drawings, find out the problems and solve them before construction.

2. The construction personnel must be familiar with the two standards of engineering quality evaluation and safety technical operation standards.

3. Pre-job training for special workers (electricians, technicians, etc.)

4. Prepare raw materials (cement, etc.) to prepare for the start of construction.


Sunshine plastic professional focus on the installation of green plastic runway, welcome to the attention.


URL of this article:http://en.ytsun.com/news/433.html

Related tags:环保塑胶跑道

Z近浏览:

Message
name:
phone:
content:
Contact

Telephone:0535-6397288

Fax:0535-6385688

purchase ingredients:0535-3459802

Project contract:0535-6397288

Address:Yantai Development Zone Zhujiang Road No. 32

Web site:www.ytsun.com

Mailbox:sunny365@ytsun.com

Code

英文站底部二维码.png

Copyright 2018,Yantai Sunshine Plastic Co., Ltd. official website case number:Lu ICP 17028532-1  Email  Internet planning:Hengshi Jiacheng
s
e
r
v
i
c
e
二维码

Scan QR code

share 一键分享